Reactive, planned and compliance work in one place
Every site, asset and certificate for every client, with respond-by clocks on the urgent jobs and planned visits that create themselves.
Sound familiar?
- Clients sending jobs by email, portal and phone, all with different deadlines
- Proving to a housing association that a repair was done in time
- Gas, electrical and F-Gas certificates for hundreds of properties to keep in date
- Agents and landlords ringing every week to ask for paperwork
The certificates, built in
Landlord Gas Safety Record (CP12)
Per-appliance checks with automatic pass/fail and Gas Safe checks on the engineer.
Electrical Installation Certificate (BS 7671 A4)
The full EIC with boards, circuit schedule and schedule of inspections. Maximum Zs fills in from the device, and notifiable work gets a 30-day Part P countdown.
EICR (BS 7671 A4)
Circuit schedule with C1, C2, C3 and FI coding on the Amendment 4 form.
Minor Electrical Installation Works (BS 7671 A4)
The A4 Minor Works certificate, completed on site.
F-Gas leak check record
Leak checks and refrigerant logged against each AC or refrigeration unit.
Awaab's Law repair tracking
Respond-by clocks and time-stamped photos and notes for social housing repairs.
What a normal day looks like
- 07:00
Overnight repairs from a housing client
Paste each email in. Jobs are matched to the property, and hazards like no heating or no power get an Emergency priority and a respond-by time.
- 08:00
Engineers sent out
The board shows who's free and who's qualified. The competence register stops a job going to someone who can't sign off the certificate.
- 11:00
Evidence on the job
Engineers record voice job sheets and time-stamped photos on site, so the Awaab's Law timeline is there if the landlord asks.
- 14:00
Agent checks their own paperwork
The letting agent opens their portal and sees every property's certificates, open repairs and due dates without ringing you.
- 17:00
Costs and invoices
Job costing shows labour and parts against the price. Invoices apply CIS and reverse charge where needed and sync to Xero.
The features you'll use most
Service contracts that create their own jobs ahead of time, every cycle.
CP12, EIC, EICR and Minor Works on BS 7671 A4, heat pump and unvented records, with renewals that book themselves.
One private link where customers see jobs, quotes, invoices and certificates.
A drag-and-drop board, a live dispatch map, best-fit suggestions and online booking.
Paste an email or enquiry — get a clean job with the customer and site matched.
The numbers that matter, plus exports of everything, whenever you want.
Frequently asked questions
Does it help with Awaab's Law?
The legal duties sit with the social landlord, but they rely on contractors to hit the timescales. Each repair carries a respond-by clock and time-stamped evidence, so you can show what was done and when.
Can we run several trades on one account?
Yes. Gas, electrical, F-Gas and service records all sit on the same job, site and asset, and the competence register makes sure only qualified engineers issue each one.
Can landlords and agents see all their properties?
Yes. A landlord or agent gets one portal across all their properties, with certificates, open repairs, invoices and due dates, live.
Do office staff need a paid seat?
No. It's £29 per field engineer a month (£24 each from 10 engineers), and office seats are free. There's no contract, and you can export all your data whenever you like.
Try it free for 30 days
No card, no contract. Your first certificate can be done today.